Delivering Integrated Security and Network Infrastructure For a National Storage Facility
National Storage facility · Mount Albert, Auckland
Project overview
- Timeline:
- Spring 2026
- Location:
- Mount Albert, Auckland
- Scale:
- 9 phases · 4 systems · built to drawings
- Systems:
- Cat6A data · CCTV · intruder alarm · comms racks and rack equipment
Scope of work
- Cat6A installation, termination and testing, partly in conduit
- CCTV camera installation and alignment
- Low-voltage alarm cabling
- PIR sensors, door reeds and alarm devices
- Comms racks built to drawings
- Rack equipment: patch panels, NVR, switch and UPS
- RS485 devices installed in the security panels
Project background
Our customer, a trade partner delivering a National Storage facility in Mount Albert, needed the site's data, security and comms infrastructure installed as one coordinated package: Cat6A data cabling, CCTV, the intruder alarm cabling and devices, and the comms racks with their equipment.
The work was specified on drawings and had to be delivered in phases across the programme, on a site that stayed operational. Each system depended on the one before it, so the order of the work mattered as much as the work itself.
Challenges
Four systems, one programme
Data, CCTV, alarm and racks each had their own devices and their own commissioning, but they shared cable routes, containment and the same comms racks. They had to be planned together.
Built to drawings
Rack layouts, device positions and cable schedules came from the design. The installation had to match the drawings, not interpret them, so the handover documents would be true.
A working site
The facility operated through the programme. Work was phased so that no stage left the site without security or access while the next one was under way.
Cabling in conduit
Part of the Cat6A ran in conduit, which fixes the route and the sequence: conduit first, cable second, with no going back to add a run later.
Cable first, then devices, then racks, then commissioning. Get the order right and a multi-system job stays calm.
How Cabling For U delivered
Survey & Design
- Walked the drawings against the building before work started and agreed the nine-phase sequence with the partner.
- Confirmed rack positions, cable routes and device locations so every later phase landed on cabling that was already in and tested.
Structured Cabling
- Installed, terminated and tested the Cat6A, including the runs in conduit, to the schedule on the drawings.
- Labelled every run so the device and rack phases could be completed without tracing cables.
Electronic Security
- Installed and aligned the CCTV cameras onto the tested cabling.
- Ran the low-voltage alarm cabling, fitted the PIR sensors, door reeds and alarm devices, and installed the RS485 devices in the security panels.
Project Delivery & Handover
- Built the comms racks to the drawings and fitted the patch panels, NVR, switch and UPS.
- One crew and one point of contact across every phase, from first conduit to final commissioning.
Project results
Cabling For U delivered the facility's data, CCTV, alarm and comms rack infrastructure as one coordinated, nine-phase package, built to the drawings and sequenced so the cabling was in and tested before any device or rack depended on it.
Because every run is labelled and every rack matches the drawings, the partner handed over a site that anyone can maintain from the documents. The next facility can be delivered the same way, from the same sequence.
On a multi-system site, the sequence is the project. Put the cabling in first, to drawings, and every system that follows has somewhere to land.
Multi-system site to fit out?
Data, CCTV, alarm and racks from one crew, built to your drawings and phased around the site. Free site survey across Auckland.
Download the PDF version
The same case study as a four-page A4 document: overview, challenges, how it was delivered and the results. Handy to forward to a colleague or keep on file.