Photo gallery: our cabling, fibre and security jobs
Every photo on this page is from one of our own jobs: comms rooms we have rebuilt, fibre we have spliced and tested, cameras and access control we have installed.
More than 350 Auckland jobs since 2018, each tested and labelled to AS/NZS 3080 and covered by our 12-month workmanship warranty.

Comms room before the rebuild: old open racks and loose cabling 
Comms room rebuild in progress: new rack on a raised plinth 
Rebuilt comms room: equipment rack with managed patching 
Finished rack: labelled patch panels and cable managers 
Finished rack: colour-coded patching, front view 
Under-floor cable entry with sweeping bends into the racks 
Fibre and copper patching in an AMP rack 
Vertical cable management with bundled Cat6 
Cat6 patch panels terminated and dressed in a wall cabinet 
Blue Cat6 horizontal cabling dressed into a rack 
Multi-rack patching with documented labels 
Network rack with fibre patching and ventilation 
Commercial comms room cable runs into the racks 
Fusion-spliced fibre tray with SC connectors 
Splice tray with dressed fibre loops 
24-core fibre tray: spliced, looped and ready to close 
Fibre splice tray, completed 
Rack-mount fibre splice drawer during termination 
Labelled fibre splice tray inside a patch enclosure 
Field fusion splicing on site 
Fibre patch panel with labelled SC/APC adapters 
Outdoor cabinet: power, batteries and network gear fitted 
Outdoor fibre cabinet with colour-coded tails 
Fibre tails routed into an outdoor cabinet 
Outdoor fibre cabinet, patching completed 
Fluke Versiv fibre test: PASS result 
Fibre certification on site with a Fluke tester 
EXFO OTDR trace on a fibre link 
Fibre test kit: light source, power meter and inspection tools 
Door release, emergency break-glass and access panel installed 
Pole-mounted PTZ and fixed cameras on a commercial site 
Ceiling-mounted Wi-Fi access point 
Network and wireless gear wall-mounted in a plant room 
Outdoor point-to-point wireless link on a pole 
Home network cabinet: fibre ONT and patch panel 
Pit and duct work for a new fibre run 
Working inside a roadside network cabinet 
Night-time fibre splicing to avoid downtime 
Cable tray work from a scissor lift 
Boom-lift install in a large industrial building 
Overhead cabling from a boom lift 
Underground pit with fibre and copper ducts 
Fibre splice closure stored in a pit 
Cable tray and containment above a ceiling
Want a job like this done properly?
Tell us about your site and we will come and look before we quote.
Book a site visitRead about recent jobs