Servicing Auckland wide · Free site survey Warkworth to Manukau
★★★★★ 5.0 on Google · Concrete scanning, Auckland

Concrete scanning before anyone cores the slab.

Rebar, post-tension cables and conduit located and marked on the surface before you core, drill or cut, then written up in a report you can hand to the engineer or head contractor. We core slabs on our own fit-outs, so we know what the coring crew needs to see.

  • Findings marked directly on the concrete
  • Written scan report for every location
  • Limits stated plainly, never hidden
  • Ground-penetrating radar, not guesswork
What the scan marks
Illustration only. Real slabs vary; the scan tells us what is in yours.
Accreditations
SiteWise RegisteredSite Safe MemberImpac Prequalified100% Kiwi Owned & Operated
Why scan first

One core in the wrong place is a structural problem, not a patch job.

What is concrete scanning? Concrete scanning uses ground-penetrating radar (GPR) to find what is inside a slab, wall or column before anyone cores, drills or cuts it: reinforcing steel, post-tension tendons, conduit, and the strands and webs in hollowcore floors. The findings are marked on the surface and written up, so the hole goes where nothing will be damaged.

Cut a post-tension cable

The tendon is under load. Cutting one can release it violently, and the slab loses part of what holds it up. Work stops until a structural engineer assesses and designs the repair.

Cut rebar

Usually survivable, but the engineer has to sign off the core, and you carry the cost of the assessment and the delay.

Cut a live conduit

Power or comms down for the floor, a trip, and an electrician called back before anyone can carry on.

What we scan for

What GPR concrete scanning finds

Rebar, top and bottom mats, before coring or drilling
Post-tension tendons, before any penetration in a PT slab
Electrical and comms conduit in slabs and walls
Slab thickness, where the slab can be read through
Voids and poor concrete, flagged for the engineer
Clearance for cabling, plumbing and HVAC penetrations
The equipment

The equipment: GPR built for concrete

A proper concrete scan uses ground-penetrating radar made for concrete inspection, not a stud finder or a cover meter. GSSI's Flex system is a good example of professional kit and shows what each part does: one base unit for floor work, plus wireless antennas for walls, ceilings and deeper targets, all saving to the same file so every location ends up in one report.

Main scanner

Flex NX

For slabs and floors. It runs a standard and a cross-polarised antenna in the same pass, so bars running both ways show up together, and the results appear live on its touchscreen as the operator scans. A quick prospecting mode finds the tendon bands first; detailed scans then go over each core position. Every scan is saved for the report.

  • 2.5 GHz antenna
  • Live view on screen, or on a paired tablet
  • Scans saved per location
Walls and ceilings

NX25 antenna

A small wireless antenna that pairs to the Flex NX. It gets into the places the main unit can't sit flat: walls, soffits, columns, corners and tight risers. Same frequency as the Flex NX, so the detail is the same, just in a smaller head.

  • 2.5 GHz antenna
  • Wireless, pairs to the Flex NX
  • Built for overhead and vertical work
Deeper targets

NX15 antenna

A lower-frequency antenna for thick slabs, slab-on-grade and columns, where the standard antenna runs out of depth. Lower frequency sees further into the concrete but with less fine detail, so it is used alongside the main scanner rather than instead of it.

  • 1.5 GHz antenna
  • Wireless, pairs to the Flex NX
  • For thick and heavily reinforced concrete

Why radar, and not X-ray or a ferro scan?

X-ray needs access to both sides of the slab, a film or plate behind it, and the area cleared of people while it runs. Radar works from one side, needs no exclusion zone, and shows results on the spot, so we can mark the slab while we're standing on it. X-ray still has a place for very congested or very thin elements; if a job needs it, we'll tell you at the site visit. A ferro scan (an electromagnetic cover meter) is quick for finding shallow reinforcing, but it only sees metal near the surface: it won't show plastic conduit or a tendon deeper in the slab.

How we do it

Scanning before core drilling, step by step

This is the same order every time, whether it's one core in a house slab or forty through a post-tensioned floor.

  1. 1

    Site visit and drawings

    We look at the slab, the core positions and sizes, and whatever drawings exist: structural, and the post-tension layout if there is one. We check access, what's directly below the slab, and whether the far side can be reached. Then we quote.

  2. 2

    Set out

    The area is cleared of debris, standing water and anything sitting on the surface. Each proposed core centre is marked, with a margin around it so a core can move if it has to.

  3. 3

    Prospect the area

    A fast sweep with the main scanner across the whole area finds the tendon bands and the main bar layout before we look at any single core. This stops a clear spot being judged in isolation.

  4. 4

    Scan each core position in two directions

    Detailed scans run across each position one way, then at right angles. Larger areas get a grid scan so we see the layout, not just a line. Walls and soffits are done with a small wall-and-ceiling antenna; thick slabs and columns get a pass with a deeper-reading antenna.

  5. 5

    Read the tendon at the core, not next to it

    Post-tension cables rise and fall across a span, high over the supports and low in the middle, so a tendon's depth a metre away tells you little. We read position and depth at the actual core location.

  6. 6

    Mark the slab

    Findings go straight onto the concrete with a colour key: tendons, bars, conduit and anything we can't identify are marked differently, and the clear area at each core is outlined. The key is written on the slab and in the report.

  7. 7

    Second side, where we can

    If a result is doubtful and the soffit or far face is reachable, we scan from that side too. If it isn't reachable, the report says the result is one-sided.

  8. 8

    Photograph and report

    Every marked position is photographed. The saved scans are turned into a written report: each location, what was found, the recommended core position, and what we could not read clearly.

What helps us before we arrive

  • Structural and post-tension drawings, if you have them
  • Core positions, sizes and what each one is for
  • Access to the area below, if the slab is suspended
  • A clear, dry surface on the day
Know the floor before you core it

Post-tensioned, hollowcore and precast floors

Auckland buildings use several floor systems, and each has a different thing you must not cut. The scan is planned around the floor type.

Post-tensioned slabs

Tendons run in bands and drape through the slab depth. Cutting one releases stored load. Australian industry guidance for PT slabs (PTIA Guidance Note GN06) sorts post-cut holes into classes by their effect on the structure and recommends a permit-to-core system on site; we scan to support that process, not replace it.

Hollowcore floors

Common in New Zealand commercial buildings. Industry guidance (CCANZ Information Bulletin 95) says penetrations should stay clear of the vertical webs and must not cut the pre-stressing strands. The scan locates the strands and webs so a core can be placed in a hollow cell.

Reinforced and precast

Conventional reinforced slabs, rib-and-infill and precast tee floors each carry their critical steel in different places. We read the drawings with the scan so the core lands outside the critical zone.

Scanning doesn't replace the engineer's approval

CCANZ's guidance is clear: a penetration through a suspended floor that isn't on the structural drawings needs written approval from the person responsible for the structural design. It also flags fire rating, acoustic separation and reinforcement cover. A scan gives that engineer the information to approve a position; it isn't the approval itself.

What you receive

Paint gets mopped. The report stays.

Marks on the floor get cleaned, ground off or covered by the next trade. For every scanned location you get the marked-up photo, what was detected, where we recommend coring and how confident we are. One document you can file with the engineer's sign-off or attach to the head contractor's permit to penetrate.

  • Marks on the concrete for the coring crew
  • Photo of every marked location
  • Written findings and recommended core positions
  • What we could not read, stated plainly
Where we scan

Sites we scan across Auckland

Commercial fit-outs

New data, power and plumbing penetrations in office and retail slabs, including relocations.

Apartments and multi-storey

Post-tensioned floors where every core needs clearing, and body corporates who want a record.

Industrial and residential

Plant bases, warehouse floors, and house slabs before plumbing or electrical penetrations.

Stated plainly

What a scan can't tell you

  • It shows that something is there, not what it is. A tendon and a conduit at a similar depth can look alike. Drawings and judgement fill that gap, and where we can't tell, the report says so.
  • The top layer can hide what's below it. Closely spaced top steel can shadow deeper tendons or conduit. Some slabs need scanning from both sides, or a lower-confidence result.
  • Depth has limits. They depend on the concrete, its moisture and what's in it. We tell you on the day what we could read; we don't promise a depth in advance.
  • Some materials are hard to see. Small plastic conduit, empty voids and some fibres can be faint or invisible.
  • No scan removes all risk. It reduces it. The engineer's drawings and sign-off still apply.
Questions we get asked

Concrete scanning FAQ

Can you find post-tension cables before we core?
Usually, yes. Post-tension tendons are one of the main reasons slabs are scanned, and in most slabs they show clearly enough to mark a safe coring position. What a scan can't always do is tell a tendon apart from a conduit at the same depth, so we check against the drawings and say in the report where we're certain and where we're not. If we can't clear a spot, we tell you.
How thick a slab can you scan through?
It depends on the concrete, how much steel is in it and how wet it is, so we don't promise a depth before we've seen the slab. On the day we tell you what we could read and what we couldn't. Thick or heavily reinforced slabs sometimes need scanning from both sides, or a different approach for the deepest part.
Can you scan walls and ceilings, not just floors?
Yes. Walls, columns and soffits are scanned the same way as a floor, as long as the scanner can sit flat against the surface. Access matters: the area needs to be clear, and ceilings need a safe platform. Tell us where the penetrations go and we'll confirm access at the site visit.
What can GPR not see in concrete?
It shows reflections, not labels. It finds steel and most conduit well, but it can't say for certain what an object is, closely spaced top steel can hide what's beneath it, and small plastic pipes, empty voids and fibre-reinforced concrete can be faint or invisible. Wet or very thick concrete reduces what it can read. We write every one of these limits into the report.
Do you mark the surface, or just give a report?
Both. Findings are marked directly on the concrete so the coring crew can see them, and every location is written up with a photo of the marked surface, what we found and where we recommend coring. Marks get cleaned off; the report doesn't, so it's the record you keep.
What equipment is used for the scan?
Ground-penetrating radar built for concrete inspection, such as GSSI's Flex system: a main scanner for slabs, a small wireless antenna for walls, ceilings and tight spaces, and a lower-frequency antenna for thick slabs and columns. The scans are saved, so the written report is built from what was actually recorded on site.
Why do you use radar instead of X-ray?
Radar works from one side of the slab, needs no exclusion zone and shows results while we're on site, so we can mark the concrete straight away. X-ray needs both sides and the area cleared of people. It still suits some very congested or thin elements, and if a job needs it, we'll say so at the site visit.
Do I need engineer approval before coring a suspended slab?
If the penetration isn't shown on the structural drawings, yes. New Zealand concrete industry guidance (CCANZ Information Bulletin 95) says it needs written approval from the person responsible for the structural design. A scan gives the engineer what they need to approve a position; it doesn't replace that approval.
Can you scan hollowcore floors?
Yes. In a hollowcore unit the things that matter are the vertical webs and the pre-stressing strands, and industry guidance says neither should be cut. The scan finds the strands and webs so a core can be placed in a hollow cell, and the report shows where.
Is concrete scanning the same as a ferro scan?
No. A ferro scan uses an electromagnetic cover meter that finds reinforcing steel close to the surface. GPR concrete scanning sees further into the slab and also picks up non-metallic conduit and post-tension ducts, which a ferro scan can miss. For coring a post-tensioned slab, GPR is the right tool.
How is a scan priced?
After a site visit. The slab, the drawings, the number of core positions and access all change the job, so we look first and then quote in writing. No surprise call-out fees and no quote that changes once we're on site without a written variation.
Guidance we work to

References

  • CCANZ Information Bulletin 95: Drilling, cutting or forming holes in suspended concrete floor slabs (Cement & Concrete Association of New Zealand, with Precast New Zealand).
  • PTIA Guidance Note GN06: Post-cut holes through post-tensioned slabs (Post-Tensioning Institute of Australia).
  • GSSI product documentation for the Flex NX, NX25 and NX15 concrete scanning systems.

Related: underground services locating before you dig, and data network fit-outs, where most of our slab penetrations happen.

Coring next week? Get it scanned first.

Tell us where the cores go. We'll visit, check the slab and the drawings, and quote after the site visit.

Digging rather than coring? See underground services locating.

0800 222 546 Same day or first hour free Free Visit 24-hour fixed quote

Frequently asked questions

Find answers to common questions about our Auckland cabling services, pricing and process. Can't find what you're after? Call us on 0800 222 546.

How much does network cabling cost?

Pricing depends on the number of data points, cable type (Cat6 / Cat6a / fibre) and building complexity. We provide free site surveys and upfront fixed-price quotes — no hidden costs. A single Cat6 outlet starts from $480, and each extra outlet from $150 +GST. Call 0800 222 546 to book yours.

Do you charge for site surveys and quotes?

No — site surveys and quotes are free. Book online or call 0800 222 546 and one of our team will come to you, assess the job, and give you a clear fixed price before any work begins.

How long does a typical install take?

A standard residential or small-office install is usually completed in a single day — often same-day. Larger commercial or enterprise projects are planned with a clear timeline given before work begins, so you always know what to expect.

Are your technicians certified and licensed?

Yes. All installs are completed to TIA/EIA and AS/NZS 3080 standards, and any associated electrical work is carried out by licensed electricians. We are fully insured with $5M public liability cover.

What areas of Auckland do you service?

We service all of Auckland — Central, North Shore, West, East and South Auckland — plus the North including Orewa, Silverdale, Warkworth, Snells Beach and Mangawhai.

Do you provide a warranty on your work?

Yes. Every cabling install is tested, documented and backed by our 12-month workmanship warranty. If anything isn't right after your install, we'll come back and fix it.

Cat6 vs Cat6a — which cable should I choose?

For most homes and small offices, Cat6 is more than enough — it handles gigabit speeds easily and is more affordable. Cat6a suits businesses running heavy data, future-proofing for 10-gigabit networks, or longer cable runs. We'll recommend the right cable during your free site survey.

How much does CCTV installation cost in Auckland?

CCTV pricing depends on the number of cameras, indoor vs outdoor placement, recording method (NVR vs cloud) and cabling required. Most residential systems are a one-day install; commercial sites are quoted after a survey. Book a free survey on 0800 222 546.

Can you install fibre optic cabling for my business?

Yes — we install indoor and outdoor fibre including OS2 single-mode and OM3/OM4 multi-mode for backbone runs, server rooms and inter-building links across Auckland. All terminations are tested and certified to AS/NZS standards.

Do you provide after-hours or emergency callouts?

Yes. Real people answer Mon–Sun, and we offer emergency callouts for downed networks, broken cabling, camera failures and business-critical outages. Call 0800 222 546 anytime.

Can you add data points to an existing home or office?

Absolutely — adding data points to existing buildings is one of our most common jobs. We minimise wall damage, label every cable and tidy patch panels so future changes are easy. Most retrofits are completed in a single visit.

NS
Reviewed by Namra Shah · Founder & Director All installs certified to TIA/EIA & AS/NZS 3080 · Auckland-owned since 2018

Still have a question about your cabling job?

Free site survey and quote, or book your job online today. Team available Mon–Sun.

Serving Auckland since 2018
About Cabling For U

Auckland's trusted cabling crew

Cabling For U is an Auckland-owned network cabling, fibre and security specialist, wiring homes and businesses across the city since 2018. From a single data point to a full multi-site rollout, we do it once, do it properly, and hand over the test reports.

Founded by Namra Shah, we've built our name on one simple promise — same day, or your first hour is free. Our own Auckland team, no call-centres. Just certified work, fixed prices and tidy installs you don't have to think about again.

350+
Jobs since 2018
5.0★
5.0★ on Google
100%
Kiwi-owned
Next step

Book your free site survey

We come out, look at the job properly, and give you a fixed written quote within 24 hours. No obligation, Auckland wide.

  • Free site survey, then a fixed written quote within 24 hours
  • Fluke-tested work, 12-month workmanship warranty
  • Site Safe accredited, $5M public liability

Prefer to talk? Call 0800 222 546

No obligation. We reply within business hours.

Auckland's same-day cabling crew

Cat6, fibre, WiFi, CCTV & alarms — installed, tested and certified. Same day, or your first hour is free. Conditions apply.

Free site survey · fixed-price quote in 24 hours · Auckland-wide