Scope of work
- Coverage survey across five office areas
- Assessment and testing of existing cable runs
- Cat6 wired backhaul, area B through C to D
- Four-node mesh: 3 first floor, 1 ground
- Configuration, testing and verification
Project background
Our customer, a barristers’ chambers occupying two floors of an Auckland CBD building, needed reliable wireless coverage across five separate office areas. Barristers work from documents and video links throughout the day, and a connection that drops during a client meeting or trial preparation is not recoverable time.
The obvious answer, an off-the-shelf mesh kit, would not have worked here. The building’s solid walls meant wireless hops between mesh nodes would lose more signal than they carried. The coverage problem was really a backhaul problem, and solving it needed cable, not more access points.
Challenges
Solid walls throughout
Node-to-node wireless relay could not carry a usable link between areas. A wired backhaul was the only route to full coverage; more access points would not have fixed it.
Legacy cabling of unknown condition
Existing runs from area B past Office 7 to area A were undocumented. Neither their condition nor their termination quality was known, so they had to be tested before anything could be built on them.
Access restricted by court commitments
The chambers were unavailable during trials. Work had to fit narrow mid-week windows and sit around client meetings. The programme belonged to the customer, not to us.
Fibre entry fixed on an exterior wall
The Chorus ONT sits on an exterior wall at area B. That position was not movable, so it set where the network had to originate and which direction the backhaul had to run.
Headroom for hyper fibre
The customer needed confidence the installation would carry 1000+ Mbps when the chambers upgrade their connection, not just handle today’s service.
Mesh nodes need a good connection to each other. In a solid building, that connection is a cable.
How Cabling For U delivered
Survey & Design
- Surveyed all five office areas across both floors and identified the solid-wall construction as the reason a wireless-only mesh would fail.
- Specified wired Cat6 backhaul from B through C to D, with wireless delivery to devices: cable where it carries the load, wireless where the user is.
Structured Cabling
- Tested the undocumented runs from B past Office 7 to A to establish condition and termination quality, and re-terminated where the existing work did not meet standard.
- Installed Cat6 backhaul from the ONT position at area B through to C and D, terminated and tested to AS/NZS 3080.
Wireless & Network
- Deployed a four-node mesh, three on the first floor and one at ground level, positioned for coverage rather than for convenient power points.
- Configured and verified coverage across offices A, B, C, D and Office 7, confirming no dead zones between areas.
Project Delivery & Handover
- Scheduled around trial commitments and client meetings, working the customer’s windows rather than our own.
- Single point of contact across survey, cabling, wireless and configuration: one crew, one accountable party, one handover.
Project results
Cabling For U completed the installation in a single working day, delivering verified wireless coverage across all five office areas on both floors, at the quoted price, with no variations.
Acting as the single point of contact across survey, cabling, wireless and configuration, Cabling For U worked entirely within the chambers’ own schedule. No work took place during court commitments, and no client meeting was interrupted.
Because the backbone is wired Cat6 rather than wireless relay, the network carries headroom well beyond the chambers’ current service. When the connection is upgraded to hyper fibre, the access points can be swapped without touching the cabling behind them. The infrastructure is already sized for it.
If your building has solid walls, adding more mesh nodes will not fix your coverage. The nodes need a good link to each other, and that link is a cable.
Wi-Fi that drops in half your building?
We survey first, then tell you whether you need cable or just better placement. Free site survey across Auckland.
Download the PDF version
The same case study as a four-page A4 document: overview, challenges, how it was delivered and the results. Handy to forward to a colleague or keep on file.
Related services
More wi-fi & wireless networks case studies
Wi-Fi that drops in half your building?
We survey first, then tell you whether you need cable or just better placement. Free site survey across Auckland.